NUSTAR DOCK Project Description Client: NuStar Energy, L.P. Location: Corpus Christi, TX Date of Completion: Jan 2014 Boh worked within a very small footprint to construct the dock, access ramp, and then set the loading arms. The dock included: a series of 30 inch and 12 inch pipelines that transfer crude oil from incoming pipelines […]

INTERNATIONAL MARINE TERMINAL DOCK
INTERNATIONAL MARINE TERMINAL DOCK Project Description Client: International Marine Terminal Location: Myrtle Grove, LA Date of Completion: Oct 2012 The dock completed by Boh Bros. is part of a three-phase expansion that occurred from 2011-2014 and doubled IMT’s capacity. IMT primarily handles barge-to-ship and ship-to-barge transfers of coal and petroleum coke. The new dock that […]

CGB BARGE DOCK FACILITY
CGB BARGE DOCK FACILITY Project Description Client: CGB Location: St. James, LA Date of Completion: Nov 2007 Boh Bros. was hired to build a barge dock consisting of three platforms, two walkways, and a large breasting dock. Fabrication of the three platforms was performed at Boh’s fabrication yard. Boh constructed a 72 x 50 square […]

AMSTY DEEPWATER LOADING DOCK
AMSTY DEEPWATER LOADING DOCK Project Description Client: Americas Styrenics LLC Location: St. James Parish, LA Date of Completion: Oct 2015 Boh Bros. Construction completed a deep-draft ship dock in the Mississippi River at St. James Parish, Louisiana for Americas Styrenics. The ship dock construction consisted of a loading platform, breasting dolphins, mooring dolphins, protection piles, […]

ST. GEORGE ISLAND BRIDGE
ST. GEORGE ISLAND BRIDGE Project Description Client: Florida Department of Transportation Location: St. George Island, FL Date of Completion: Feb 2004 The 4.5 mile bridge spans the Appalachiocola Bay from Eastpoint, Florida to St. George Island, a barrier island off the coast of Florida. The design build proposal allowed Boh Bros. to have complete control […]

REPLACEMENT OF I-10 TWIN SPAN BRIDGES
90% self-performed, largest project let by LADOTD at the time, delivered on-time and on-budget, earned early completion bonus allowed for Phase I