Ft. Lauderdale-hollywood international airport

About this Project

In 2019, Boh Bros. traveled to Ft. Lauderdale, Florida to work as the paving contractor on the $64 million rehabilitation effort for Ft. Lauderdale-Hollywood International Airport. Boh Bros.’ scope included nearly $16 million in concrete paving and involved both the replacement of the North Runway and sections of Taxiway B. A strict timeframe and schedule made for a relentless pace of work. When the project broke ground, for instance, milling machines ran 24/7 for 130 hours, stopping only for fuel and crew changes.

The North Runway for the Ft. Lauderdale-Hollywood International Airport was completely shut-down with a re-opening date set for mid-November. Boh crews met the schedule challenges and the runway was back in operation within the required timeframe. In all, Boh Bros. placed over 105,000 square yards of 6-inch P306 concrete and more than 88,300 square yards of 17-inch P501 concrete.

  • Date: 2019

  • Client: FT.LAUDERDALE-HOLLYWOOD INTERNATIONAL AIRPORT

  • Project Type: paving

About this Project

  • Date: 2019

  • Client: FT.LAUDERDALE-HOLLYWOOD INTERNATIONAL AIRPORT

  • Project Type: paving

In 2019, Boh Bros. traveled to Ft. Lauderdale, Florida to work as the paving contractor on the $64 million rehabilitation effort for Ft. Lauderdale-Hollywood International Airport. Boh Bros.’ scope included nearly $16 million in concrete paving and involved both the replacement of the North Runway and sections of Taxiway B. A strict timeframe and schedule made for a relentless pace of work. When the project broke ground, for instance, milling machines ran 24/7 for 130 hours, stopping only for fuel and crew changes.

The North Runway for the Ft. Lauderdale-Hollywood International Airport was completely shut-down with a re-opening date set for mid-November. Boh crews met the schedule challenges and the runway was back in operation within the required timeframe. In all, Boh Bros. placed over 105,000 square yards of 6-inch P306 concrete and more than 88,300 square yards of 17-inch P501 concrete.

Ft. Lauderdale-Hollywood International Airport project Gallery

Check out our Images from the Ft. Lauderdale-Hollywood International Airport Project.

 

 

Latest Projects

Avondale Marine Project

Boh Bros. assisted Avondale Marine in rebuilding Dock No. 2 so that Host can use the dock’s existing pilesupported ship ways to construct a suspended roadway. Once operational, trucks will be able to carry heavy loads from dock to land, and vice versa, as the roadway will have a 100-ton capacity. 

Lake Pontchartrain Causeway Safety Bays CMAR Project

The Greater New Orleans Expressway Commission (GNOEC) sought to improve the safety of the 23.83 mile Lake Pontchartrain Causeway Bridges by adding shoulders and emergency pullover areas on both spans. The GNOEC chose a Construction Management at Risk (CMAR) delivery method for a solution to meet their stated goals.

Aerial View of florida ave. Project

The Florida Avenue Project

The Florida Avenue Canal improvement project, as part of the Southeast Louisiana Urban Flood Damage Reduction Program (SELA), consists of widening the existing concrete flume and box culvert sections of the Florida Avenue Canal from Drainage Pump Station 19 to Drainage Pump Station D. Boh Bros.

Contact Us

Name(Required)

730 S. Tonti Street, New Orleans, LA

504.821.2400

Contact@bohbros.com