Our Facilities

Over 90% of our work is self-performed

Boh Bros. works directly for owners, and also works as a subcontractor to prime contractors

Boh Bros. annually completes over 150 Civil, Marine, and Industrial Construction projects for a variety of public, industrial, and commercial clients.

Almonaster Operations 

Facility  

Almonaster Yard Boh Bros Aerial Image

Address: 10300 Almonaster Ave. New Orleans, LA 70127 

160 acre yard located in New Orleans East at mile marker 12, east of the Industrial Canal on the Gulf Intercoastal Waterway making it accessible by both land and water  

On-Site Facilities:

  • New Training Center (2019) 
  • Piling and Marine Facility  
  • Carpentry and Form Fabrication Shop  
  • AISC Certified Steel/Pre-Cast Fabrication Facility  
  • RO/RO Capabilites  
  • Equipment Laydown Yard  

    Asphalt Plant 

    Address: 3401 France Road, New Orleans, LA 70126 

    Astec asphalt plant located on 20+ acres along the New Orleans Industrial Canal with dedicated wharf access for unloading material barges with alternative access to rail. Our plant supplies asphalt for the needs of Boh Bros.’ construction projects, outside contractors and private sales customers. 

    Corporate Headquarters 

    Address: 730 South Tonti Street, New Orleans, LA 70119 

    Located just before the Superdome, the main office is our operations center and home to our administrative, engineering, project, and executive teams.

    Boh bros Main office aerial Picture

    Baton Rouge Office

    Address: 9517 Jefferson Hwy., Baton Rouge, LA 70809 

     

    Full-service operations center, serving the Baton Rouge area and geared toward industrial clients.   

    Boh Bros Baton Rouge Location

    Latest Projects

    Avondale Marine Project

    Boh Bros. assisted Avondale Marine in rebuilding Dock No. 2 so that Host can use the dock’s existing pilesupported ship ways to construct a suspended roadway. Once operational, trucks will be able to carry heavy loads from dock to land, and vice versa, as the roadway will have a 100-ton capacity. 

    Lake Pontchartrain Causeway Safety Bays Project

    The Greater New Orleans Expressway Commission (GNOEC) sought to improve the safety of the 23.83 mile Lake Pontchartrain Causeway Bridges by adding shoulders and emergency pullover areas on both spans. The GNOEC chose a Construction Management at Risk (CMAR) delivery method for a solution to meet their stated goals.

    Ft. Lauderdale-Hollywood International Airport

    Boh Bros. traveled to Ft. Lauderdale, Florida to work as the paving contractor on Ft. Lauderdale-Hollywood International Airport’s $64 million rehabilitation effort. Boh Bros.’ scope included nearly $16 million in concrete paving and involved both the replacement of the North Runway and sections of Taxiway B. 

    Contact Us

    Name(Required)

    730 S. Tonti Street, New Orleans, LA

    504.821.2400

    Contact@bohbros.com